Installing A-PLY®
Smooth Faced Walls
Navy Walls

A-PLY - In The Field®
Services
Custom Installations
Extreme Conditions

Contact A-PLY®
E-Mail A-PLY®
For Further Info On A-PLY®

Permitting
Permitting Info

Boat Lifts
All About Boat Lifts
Hi-Tide Boat Lifts
Lift & Dock Accessories
Hi-Tide Boat Lift Video

Lift Contact Info
E-Mail Us
For Further Info on Boat Lifts

Consulting
About Us
Consulting Services
Expert Witnessing
Training Books
On-Site Training
What's New
Request for Information/Contact

External Links
Hi-Tide Boat Lifts

This series of pictures show the performance of A-PLY® in EXTREME ENVIRONMENTS AND CONDITIONS.

Here is a photo of a smooth faced A-PLY® wall in a large marina frozen over by thick ice. The thick ice in front of the wall, at each change of the tide does NOT cling to the smooth face. Instead it actually forms separations as seen by the lines adjacent to and about one foot away from the wall. These lines are where the ice has separated due to the presence A-PLY® face.

 

This series of photos show the marina and the A-PLY® wall, located on the open bay. This severe condition is a good example of the excellent performance of A-PLY® even during periods of what the industry calls “piling ice” caused by winds and shifting tides.

Advanced Bulkhead Corporation
288 Shore Drive
Oakdale, NY 11769
NY 631-807-0300
FAX 631-244-8784
john.morena@inetmail.att.net